Tom's Watch Bar in Downtown Phoenix

Discover how we delivered an immersive sports-viewing AV system on an impossible timeline. Tom's Watch Bar Phoenix audiovisual Case Study.

Client
Tom's Watch Bar
Location
Phoenix, AZ
Industry
Sports Bars
Scope
AV Integration
Completed
2025
100 TVs
40 Speakers
7 Audio Zones
2 wk Timeline
01

Project overview

100-Display Sports Bar AV Installation

The Crunchy Tech team recently wrapped an expansion project for Tom's Watch Bar in Phoenix, Arizona. We're proud to have set a new company record for installation speed while delivering the 360-degree sports-viewing experience Tom's Watch Bar is known for.

Tom's Watch Bar in Downtown Phoenix — overview
Project overview
Install Phoenix, AZ
02

Project challenges

Tight Two-Week Project Timeline

This Phoenix site came with some distinctive challenges. The biggest was the clock: only two weeks for the full installation, far shorter than the typical month-long AV schedule, which set the tone for a fast, tightly coordinated effort.

The install called for 100 TVs, including twenty 55" displays, one 98" in landscape, one 98" in portrait, and nine 55" outdoor full-sun TVs. We also built a 2×2 video wall of 65" displays, three more video walls, and a Jumbotron.

To handle a range of content sources, we installed twelve HDMI inputs, including a USB-C wall plate for extra flexibility. For audio, we placed 40 commercial speakers – pendant, ceiling, and subwoofers – positioned for full, balanced sound throughout the space.

We tied it all together with a comprehensive control system, working around existing architectural features while coordinating with the other contractors on-site at the same time.

03

Understanding the client's needs

Immersive Sports-Viewing Experience

The client's main requirement was a faster installation schedule that gave up nothing on the quality or functionality of the sports-viewing experience the Tom's Watch Bar brand is built on. Hitting their business timeline made this one of the toughest challenges we've taken on in recent memory.

04

Technical solutions

One platform, integrated subsystems

Technology partner Components Role in project
Philips / LG 100 digital displays including 55″, 98″ landscape, 98″ portrait, and outdoor full-sun TVs; four video walls; Jumbotron Delivered high-impact visuals and 360-degree sports viewing across indoor and outdoor zones
Savi Control Systems Centralized AV control system, SAVI Canvas, DirecTV guide integration, iPad/web control Unified control of all AV components; supported multi-view display layouts and custom content scheduling
QSC (12) pendant speakers, (12) ceiling speakers, (2) ceiling subwoofers, (6) outdoor speakers Provided seven distinct audio zones with balanced coverage across interior and exterior spaces
05

Implementation methodology

Integrated Design-Build Approach

We followed our signature design-build AV methodology, and it's what made the record two-week design-to-build timeline possible. From day one, architects, engineers, and construction teams worked hand in hand to get the job done.

Crunchy Tech works differently from other AV integrators. We adapt our systems and procedures to meet strict timelines. What looks unfeasible for a traditional integrator is a compressed version of what we do all the time. Deploying parallel teams and using pre-configured equipment wherever possible let us fit this project into a 14-day installation.

Our project management system also allowed real-time tuning and prioritization, so path-critical items always got addressed first. Daily all-hands coordination meetings with every stakeholder headed off bottlenecks before they could touch the timeline.

Essential List

We pulled off this rapid deployment thanks to strong partnerships with leading technology in the industry.

Together, these built a high-performance AV setup that delivered exactly what Tom's Watch Bar is known for: an unbeatable sports-viewing experience. The Philips and LG displays brought the energy with crisp, punchy visuals in every corner of the venue. QSC's audio made sure the sound hit right in every zone, inside and out. Savi's control system kept it all simple to manage and running like clockwork on game day and beyond.

06

Results & impact

Immersive Sports Entertainment

The finished venue delivers 360-degree viewing across all 100 high-definition screens, anchored by a stadium-sized centerpiece that gives every seat a clear sightline for the big game.

07

Finishing the project

Pushing Limits, Setting Standards

The Tom's Watch Bar Phoenix project demonstrates Crunchy Tech's ability to meet seemingly impossible deadlines with no trade-offs in quality or functionality. By blending technical skill with strong partnerships and a sharp approach to project management, Crunchy Tech delivered a sports-viewing experience that cleared the bar and then some.

This record two-week installation met the client's immediate needs and set a new benchmark for efficiency that will benefit our customers going forward.

Facing an AV deadline that sounds impossible? Let's talk about how Crunchy Tech moves fast without cutting corners.

Get Started

Ready to Transform Your Space?

Tell us about your vision and we'll put together a custom proposal.

  • Free 1-on-1 phone consultation
  • Professional installation with minimal downtime